My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 12:33:05 PM
Creation date
9/15/2020 10:39:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TAN <br /> MONITORING SYSTEM CERTIFIC ATION FORM <br /> VIII . MONITORING SYSTEM AND PROGRA OMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring Y N N/A <br /> Are the visual and audible alarms operational ? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ens re that floats ® ❑ ❑ <br /> move freely, functionality tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other eq ipment will not ® ❑ ❑ <br /> interfere with their proper operation ? <br /> Was monitoring system set- up reviewed to ensure proper settings? ® El El <br /> Was the monitoring panel's backup battery visually inspected, functionality tested, and confirmed o erational? ® ❑ ❑ <br /> Does the flow if fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system f ils to operate or ® El E] <br /> is electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ElEl <br /> Which sensors initiate positive shut down? (Check all that apply) ® Sump ® Under—Dispenser <br /> Containment <br /> if alarms are relayed to a remote monitoring station, is all communications equipment (e . g ., mode ) operational ? ❑ ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will a corrected. <br /> IX. COMMENTS <br /> X . IWTANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control . (Do not complete this section . <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section) Y N N/A <br /> This section must be completed if imtank gauging is used to perform leak detection monitoring. ❑ ❑ ❑ <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and ter ination, <br /> including testing for ground faults? <br /> Were all In-tank gauging probes visually inspected for damage and residue build up to ensure that loats move El El 1:1 <br /> freely, functionally tested, and confirmed operational ? ❑ ❑ ❑ <br /> Was accuracy of system' s product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system' s water level readings tested ? <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed? ❑ ❑ I ❑ <br /> For any answer of "N" above, describe in Section XI how and when these deficiencies were or wil be corrected. <br /> XI . COMMENTS <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.