Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of s) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Trusco/Glass Steel A El I B x❑ I C ❑x D ❑ <br /> A ❑ I B ❑ I C ❑ I D <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> px Industry Code or Engineering Standard (Specify): PEI / RP900/Glass Steel Tank/- 10 " Hg . 1 Hour <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Tank Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> Tank #213-& 3- C is a two compartment tank with 6K 91 and 6K Diesel . Single Tank Secondary Containment . <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith Fibercast FRP A ❑x 1 B X I C ❑x D ❑ <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> px Industry Code or Engineering Standard (Specify) : PEI / RP900/ Fiberglass Pipe/5 PSI 1 hour <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> See comments Section VIII <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> It is not alway possible to verify Test Pressure continuity when Test/Seal Off Boots at UDC' s cannot be reached to loosen <br /> clamps . Some UDC' s have bottom Penetrations for the Piping and have no access to the Secondary portion of the Piping <br /> to allow verification of continuity without breeching the integrity of the sealed system at the UDC end of the Piping Run . <br /> E <br /> ID = Identification <br />