Laserfiche WebLink
• 0070 no 0 <br /> 1 <br /> Turbine O TurbineO Turbine O i <br /> Sump Sump Sump FLAT METAL <br /> / ANGLEIRON <br /> O REQUIRED <br /> TO SUSPEND <br /> r PROBE a o <br /> I I ( SIDE VIEW) <br /> RECEPTACLES <br /> suM4 o FOR FOUR <br /> I O O I SCREWPROBE <br /> _ 3 o PL CABLE PLUGS <br /> Irl I11El10 20 <br /> O O <br /> I Tank Pad I rl-l: ® <br /> TAPE / WEIGHT DOWN <br /> CABLE TO PREVENT <br /> QO 10 Feet Min - Distance ACCIDENTAL O <br /> Per NFPA 30A MOVEMENT DURING <br /> LEAK TESTING TS - STS <br /> ( PROBE CABLE SUMP TEST SYSTEM <br /> PN : 600 - 0200 SPLIT RING o 0 0 <br /> = 50 FEET) <br /> POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3- PRONGED <br /> CONES PLUG <br /> suui o <br /> STS - PRB- 12 <br /> LEAK TESTING <br /> GROUNDEDPROBE WITH : <br /> tre TSP- SSP <br /> NG STAINLESS <br /> EXTEONSION ® STEEL FLOAT <br /> CORD REQ ' D <br /> TS-STS <br /> SUMP TEST SYSTEM UU <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> ( Side View) <br /> BUILDING <br /> Figure 1. 3 Typical Leak Detection Probe — Turbine Sump Installation Figure 1. 4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br />