Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification UST Monitoring Site Plan <br /> • Site Address- 1001 E. YOSEMITE AVE. MANTECA CA 95336 <br /> - - - - - - - - - - - - - - - - - - - <br /> Convenience Store <br /> 91 87 L . <br /> e <br /> . - n <br /> T I t <br /> X P X S <br /> No T <br /> . _ Z3. gpgg _ - _ KED' <br /> A = ATC%' ILAR <br /> F = FELLS <br /> t . _ T = TURBINE <br /> P = PROBE _ <br /> . . . VAPOR <br /> . . . _ . - X = SUMP <br /> _ _ F SENSOR <br /> G } L = PL <br /> *PIPE\ T L = PLED <br /> (ARRONTIS) rZ = hfamvac <br /> Drawing of piping A B = Brine Sensor <br /> exit of sump and DIE I = Smart Sensor <br /> UDC's. Ko S = STP <br /> underground C = Floats 6t Chains <br /> drat vrg is accurate, <br /> V.ve cannot I I . . _ . . . . . . . . . . . . . . . . . . . I _ . <br /> speculate blue <br /> prints. - <br /> . . . . . . . _ . . - YOSEMITE AVE. . <br /> APP iternr wadetWound that are nor visibie ro the certi(dng technician ma a <br /> prgfessfonalapfttionortjv mid m'ssoletilforirlfomtariouaipurpo:es. DrmvhT <br /> nor to scale <br /> Date map was drawn : 1122119 <br /> Instructions <br /> If you already have a diagram that shows all required information- you may include it rather than this page• with your Monitoring System Certification. On your site plan , - <br /> shcvr the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed_ monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Sag Plan, was prepared. <br /> LEGEND <br />