Laserfiche WebLink
P VV Installer Attestation No. 1()4777 <br /> Brian Thornton <br /> VR-102 Thornton Environmental Construction, Inc <br /> EVR UST Certification Course <br /> On: 3/15/2018 Exp Date: 03/14/2020 <br /> Completion of this training course does not c,eete a waIrarty or guaranty by r VW of your instailauan <br /> and/or mantrunae of nooks,vapor recovery systems and EVR PHASE I systems.This training <br /> course does not eimirute the need to st,x*ad-one to manufacturer swirnxoo s and prxedu es <br /> when insLling and maintaining names,vaDO'recovery systems and EVR PHASE I Systems.AN <br /> nozzles,vapor recovery systems and Blit PHASE I Systems rust De rwta3d and maintained in <br /> .ccordance with manufacwrer instructions and procedures.Attestation applies r rNLY w tested nsned <br /> in&v,duaL <br /> Installer Attestation No. 104777 <br /> Brian Thornton <br /> VR-102 Thornton Environmental Construction, Inc <br /> EVR AST Certification Course <br /> on: 3/15/2018 Exp Date: 03/14/2020 <br /> completion of dws training course does not c-este a warranty or gus.rty by r*%V of your instaAAOm <br /> and/or nufnamance of nozzles,vapor recovery systems and EVR PHASE I systems.This tra rwq <br /> course does not eiminaoe the need to sr,wdy ad uve to manufacturer i Ktrtrtt O u and arocedures <br /> when instating and maintaining nozries,v.Do,-ecovery systems and EVR PHASE I Systems.AA <br /> nozzles,vapor recovery systems and EVR PHASE I Systems mist be instated and maintained in <br /> accordance with manufecwre•inrsVuctions and procedu es.Attestiton.pedes t rNLY to tested named <br /> indviduaL <br />