Laserfiche WebLink
rA IA <br /> OPW 71SO Overfill M r"NI Important <br /> Id <br /> f . In order to prevent product <br /> Prevention Valves " " r spillage round <br /> Valve Body: Cast Arfiinum g g <br /> The CARB-certified OPW 71 SO StorageTank (UST), properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve: Aluminum F V; tight-FII adaptor are essential. <br /> Seals: Viton® i Delivery personnel should <br /> underground storage tanks by providing be managed and trained <br /> a positive shut-off of product delivery. Upper & lower DropTube : Aluminum ' <br /> to inspect delivery elbows <br /> The shut-off valve is an integral part of plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . missing parts They should <br /> Hardware: Stainless steel always make certain there <br /> The OPW 71 SO allows easy installation . is a positive connection <br /> (without breaking concrete) and requires t� r� S between the adaptor and <br /> Featno special manholes. elbow. If delivery equipment <br /> Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> special manholes required . coupled pthe adaptor, a <br /> stage shut-off valve. When the liquid s <br /> P q serious spill may result when <br /> level rises to about 95 % of tank Economical — costs a fraction the OPW 71 SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> released, closing automatically with of expensive, complicated and contamination. <br /> the flow. This reduces the flow rate to difficult-to-install valves. <br /> approximately 5 gpm through a bypass Furnished Complete — supplied NOTE: The OPW 71 So is <br /> valve. The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> p y p gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95 % level, the valve will Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform , no resets Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . Quick Drain Feature — <br /> liquid rises to about 98 % of tank No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> I completely. No additional liquid can flow Will Accept a Dipstick Best Flow Rate in The Industry * <br /> into the tank until the level drops below <br /> a reset point. for Gauging * OPW Test Lab results <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness orspeed of response of the <br /> governing shut-off capacity in your p Speeds Delivery Operations <br /> Edelivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfillrevention . <br /> j other considerations such as extreme p the tank until the hose " kick " that <br /> r tank tilt . In all cases, the upper tube Keeps the Top of UST "Dry;' accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 1 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing _ additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: H15524PA <br /> Look for this Iabel for <br /> Li <br /> � � figs t authentic OPW EVR <br /> UL(`i Approved products. <br /> inti is ionS Resources Board * * OPW 71SOM is EVR Approved for E85 <br /> d <br />