Laserfiche WebLink
: S A N J O A Q U I N Environmental Health Department <br /> f`—vtness grov' <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> Lawrence Livermore National Lab-Site 300 (925)422-9777 August 13, 2019 <br /> Facility Address: CERS to: <br /> 15999 W CORRAL HOLLOW RD, TRACY, CA 95376 10154767 <br /> Inspection Contact: Title: Phone: <br /> Eric Mertesdorf Environmental Analyst (925)789-7828 <br /> Inspection Type: Program: <br /> ROUTINE INSPECTION-Operating Permit 2361 -UST FACILITY <br /> Consent For: Consent Given By: <br /> 0 Inspection 0 Photos 0 Samples Eric Mertesdorf,Environmental Analyst <br /> Service Technician Onsite: Exp.Date: Designated Operator: Exp.Date: <br /> Brian D Thornton 03/26/2020 Brian D Thornton 03/20/2020 <br /> Service Technician Manufacturer's Training: <br /> VR.05/20/21 VMI,01/09/21 OPW.03/14/20 <br /> CCR=Title 23 Califomia Code of Regulations HSC=Health and Safety Code CFR a Code of Federal Regulations <br /> V=Violation R=Repeat violation COS a Corrected on site during inspection <br /> Fite Review <br /> 101 HSC 25284;CCR Failed to obtain a permit to operate from the EHD including but not limited to unpaid permit fees =V o R o COS <br /> 2711(d) <br /> 102 HSC 25284(a)(3)(A)1(8) No written agreement between tank owner and tank operator to monitor the tank system :IV n R d COS <br /> 103 HSC 25292.2,25299.30 Failure to submit and maintain complete and current financial responsibility documents :IV ,�R o COS <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current :IV c R G COS <br /> 105 CCR 2632(d)(1), Failed to have an approved UST monitoring plan :IV O R G COS <br /> 2634(d) <br /> 106 CCR 2632(d)(2), Failed to have an approved UST response plan •V R COS <br /> 2634(e) <br /> 107 CCR 2632(d),2641(h), Plot plan/site map not submitted or failed to completely show where mon tonng is performed :V R COS <br /> 2711(a) <br /> 108 CCR 2637,2638(e), Failed to notify the EMD 48 hours prior to conducting testing V o R =COS <br /> 2643(g) <br /> 109 CCR 2637(.-d),2712 Failed to test secondary containment,or failed to mainta n test records for 36 months -4V c R a COS <br /> 110 CCR 2637(x),2637(f) Failed to submit"Secondary Containment Testing Report Form'within 30 days after the test ,I V o R COS <br /> 111 CCR 2638,26410), Failed to test monitoring and leak detection equipment every 12 months , V t.R COS <br /> 2715(f) <br /> 112 HSC 25293 Failure to maintain UST records to enable the UPA to determine whether the UST-s in compl.anoe V c R COS <br /> 113 CCR 2638(c),2638(d) Failure to submit"Monitoring System Certification Form'with-n 30 days of completion of the test a V D R =COS <br /> 114 CCR 2636(0(3),2643(c) No 0.1 gph annual line integrity test for pressurized p ping.or within 30 days after repair a V o R c COS <br /> (3) <br /> 115 CCR 2715(.)(1)(6), "Designated Underground Storage Tank Operator Identification Form"not submitted within 30 days iiV o R P.COS <br /> 2715(x)(3) <br /> 116 CCR 2715 Designated operator,service tech or installer did not possess current CC certification a V o R r.COS <br /> 117 CCR 2663, 2712(b)(6) Failure to comply with tank lining,recordkeeping,and inspection requirements o V p R ,.COS <br /> 118 CCR 2715(a)(1)(A), Failure to submit the"Underground Storage Tank Statement of 1vnderstand ng and Compliance Form" o V o R COS <br /> 2715 a 2 <br /> 119 HSC 25299(a)(8), Documents were falsified or misrepresented -j V o R COS <br /> 25299 b 7 <br /> 120 CCR 2635(d) Failed to submit UST Certification of Installation/Modification ,+V p R COS <br /> 121 CCR 2712(0 Failed to submit a written response within 30 days of receiving an inspection report a V p R COS <br /> FA0003934 PRO231945 SC001 08r13r2019 <br /> EH0 2301 Rev 09/28/2018 Page 1 of 5 Underground Storage Tank Program OIR <br /> 1868 E Hazelton Avenue I Stockton, California 952051 T 209 468-34201 F 209 464-0138 1 www.sjcehd corn <br />