My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 9:47:36 AM
Creation date
9/15/2020 3:34:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTON <br /> Overfill Prevention Inspection - OPW 61 and 71 Series Devices <br /> Date: <br /> Owner: ��/7,�' <br /> Fac lity:426 C`, C <br /> OPW Overfill Model Number: _ ,C�i9�/.��J� dim) <br /> Part 1 - Proper Height Setting Calculation C/ <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons V� G C <br /> Max shut off requirement for flapper is 95 % B 95% <br /> Multiply Max tank volume by 95 % C Gallons9400 <br /> Use tank chart or ATG to determine height of <br /> calculated volume b A Inches , ��/j 004�05 > 3 ?or 3o <br /> Measure top of fill riser threads, or face seal <br /> adapter E Inches <br /> Tank diameter (From Tank Chart) F Inc es �4� <br /> Upper Tube in Tank (G) F-D = G ; , G Inches <br /> Subtract 2" from upper tube in tank Gl"= K Inches - <br /> Calculated minimum upper tube length (n <br /> I Inches <br /> K+E=I <br /> Actual measured upper tube length (Without i <br /> fill adapter) (J) J Inches <br /> Part 2 - Device Certification Crite ` a Evaluation <br /> Does the overfill prevention device meet e 95 % <br /> requirement? <br /> Is the actual measured upper tube len I i 6.5 inches or w <br /> more than the fill riser? (J must be 6.5 '7or more than E) + 9 <br /> Does the overfill prevention device fL ction as required? <br /> (Inspect the device for damage, con ation, freedom of U 5 2019 <br /> movement, weakening due to wear Ed corrosion) <br /> ENVIRONMPKITAI <br /> Device Overfill CTPAA <br /> ATL T <br /> [.DropTube Testing ' — <br /> es that the device is operationally compliant. <br /> Signature of TechDate : <br /> Technician's Name : <br />
The URL can be used to link to this page
Your browser does not support the video tag.