My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:28:48 PM
Creation date
9/15/2020 3:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231995
PE
2361 - UST FACILITY
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1403 W COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Spill Bucket <br /> ♦, CGRS Integrity Testing <br /> Form <br /> SOLUTIONS DELIVERED Underground Storage Tanks ( UST) Program <br /> Instructions on Page 3 <br /> Purpose : This procedure is to test the leak integrity of single - and double -walled spill buckets . See reverse side for basic <br /> hydrostatic testing instructions . Consult PEI/RP1200 , Section 6 .2 for hydrostatic test method , Section 6 . 3 for single -walled <br /> vacuum test method , and Section 6 .4 for double -walled vacuum test method . <br /> Testing Information <br /> 1 . Tank number T-1 Diesel T-2 87 T-3 91 T4 Diesel <br /> 2, Prod uctstored Diesel #2 87 unleaded 91 supreme Waste Oil <br /> 3. Spill bucket capacity 5 gallons 5 gallon 5 gallon 5 gallons <br /> 4. Manufacturer OPW OPW OPW CNI <br /> ® Single-walled ® Single-walled ® Single-walled ® Single -walled ❑ Single-walled ❑ Single-walled <br /> 5. Construction ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> ® Hydrostatic ® Hydrostatic ® Hydrostatic ® Hydrostatic ❑ Hydrostatic ❑ Hydrostatic <br /> ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum <br /> ❑ Single -walled ❑ Single -walled ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single -walled <br /> 6. Test pe ❑ Double -walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> ® Product N Product ® Product ® Product ❑ Product ❑ Product <br /> 7 . Spill bucket type ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor <br /> 8 . Liquid and debris <br /> removed from spill <br /> bucket:* ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> 9. Visual inspection <br /> (No cracks , loose parts <br /> or separation of the <br /> bucket from the fill <br /> pipe,)? E Pass [] Fail ® Pass ❑ Fail ® Pass ❑ Fail [] Pass ® Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 10. Tank riser cap <br /> included in test? ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 11 . Is drain valve included <br /> in test? ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 12. Starting level 12" 11 %53 11 WI Visual Failure <br /> 13. Test start time 9 : 00am 9 : 00am 9 : 00am <br /> 14. Ending level 12" 11 %35 11 %15 <br /> 15. Test end time 10 : 00am 10 : 00am 10 : 00am <br /> 16 . Test period 1 hour 1 hour 1 hour <br /> 17. Level chane 0 . 0" 0 . 0 " 0 . 0 " <br /> Test results : ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ® Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 118 inch; Vacuum single-walled only; Maintain at <br /> least 26 inches water column; Vacuum double-walled; maintain at least 12 inches water column. <br /> Comments : <br /> 1 . T4 Waste Oil spill container is damaged and is torn / cut all around entire container. Recommend <br /> to replace with OPW below grade spill container. <br /> * All liquids and debris must be disposed of properly. <br /> 60 CGRS <br /> Testing company name : I S�UUTIaNS Tester's name : Richard Thomas <br /> Date : 05/22/19 Tester's signature : C4� c� <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.