My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 2:28:48 PM
Creation date
9/15/2020 3:58:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231995
PE
2361 - UST FACILITY
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1403 W COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification <br /> <br /> <br />UST Spill Bucket <br /> Integrity Testing Form <br />Underground Storage Tanks (UST) Program <br /> <br />Instructions on Page 3 <br />Purpose: This procedure is to test the leak integrity of single- and double-walled spill buckets. See reverse side for basic <br />hydrostatic testing instructions. Consult PEI/RP1200, Section 6.2 for hydrostatic test method, Section 6.3 for single-walled <br />vacuum test method, and Section 6.4 for double-walled vacuum test method. <br />Testing Information <br />1. Tank number T-1 Diesel T-2 87 T-3 91 T-4 Diesel <br />2. Product stored Diesel #2 87 unleaded 91 supreme Waste Oil <br />3. Spill bucket capacity 5 gallons 5 gallon 5 gallon 5 gallons <br />4. Manufacturer OPW OPW OPW CNI <br />5. Construction <br /> Single-walled <br /> Double-walled <br /> Single-walled <br /> Double-walled <br /> Single-walled <br /> Double-walled <br /> Single-walled <br /> Double-walled <br /> Single-walled <br /> Double-walled <br /> Single-walled <br /> Double-walled <br />6. Test type <br /> Hydrostatic <br /> Vacuum <br /> Single-walled <br /> Double-walled <br /> Hydrostatic <br /> Vacuum <br /> Single-walled <br /> Double-walled <br /> Hydrostatic <br /> Vacuum <br /> Single-walled <br /> Double-walled <br /> Hydrostatic <br /> Vacuum <br /> Single-walled <br /> Double-walled <br /> Hydrostatic <br /> Vacuum <br /> Single-walled <br /> Double-walled <br /> Hydrostatic <br /> Vacuum <br /> Single-walled <br /> Double-walled <br />7. Spill bucket type <br /> Product <br /> Vapor <br /> Product <br /> Vapor <br /> Product <br /> Vapor <br /> Product <br /> Vapor <br /> Product <br /> Vapor <br /> Product <br /> Vapor <br />8. Liquid and debris <br />removed from spill <br />bucket:* Yes No Yes No Yes No Yes No Yes No Yes No <br />9. Visual inspection <br />(No cracks, loose parts <br />or separation of the <br />bucket from the fill <br />pipe.)? Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail <br />10. Tank riser cap <br />included in test? Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA <br />11. Is drain valve included <br />in test? Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA <br />12. Starting level 12” 11 ¾” 11 ¾” Visual Failure <br />13. Test start time 9:00am 9:00am 9:00am <br />14. Ending level 12” 11 ¾” 11 ¾” <br />15. Test end time 10:00am 10:00am 10:00am <br />16. Test period 1 hour 1 hour 1 hour <br />17. Level change 0.0” 0.0” 0.0” <br />Test results: Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail <br />Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only; Maintain at <br />least 26 inches water column; Vacuum double-walled; maintain at least 12 inches water column. <br />Comments: <br />1. T-4 Waste Oil spill container is damaged and is torn / cut all around entire container. Recommend <br /> to replace with OPW below grade spill container. <br /> <br />* All liquids and debris must be disposed of properly. <br />Testing company name: <br /> <br />Tester’s name: Richard Thomas <br /> <br /> Date : 05/22/19 Tester’s signature: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.