Laserfiche WebLink
UST System Secondary Containment Testing Requirements ‐ Page 3 of 3  <br />   <br />D. Industry Standards for Testing <br />1. As noted above, the use of industry codes or engineering standards is only allowed in cases where the <br />secondary containment manufacturer does not have their own guidelines or standards. <br />2. Industry codes must be published. <br />3. The Petroleum Equipment Institute’s (PEI) Recommended Practices for the Testing and Verification of <br />Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities (PEI/RP1200‐17) is <br />one example of a generally‐recognized industry standard. <br />E. Notification and Reporting <br />1. The UST owner/operator must notify the local UST Program Unified Program Agency (UPA) at least 48 <br />hours prior to conducting secondary containment testing. [23 CCR §2637(g)] <br />2. Results of secondary containment testing must be recorded on the Secondary Containment Testing <br />Report Form located in Appendix VII of Title 23 California Code of Regulations. [The Unidocs document <br />number is UN‐054.] [23 CCR §2637(e)] <br />3. A voluntary‐use Unidocs Secondary Containment Testing Report Form Supplement (UN‐054A) is also <br />available to assist with requirements for documenting and reporting test data. <br />4. Pass or fail, the UST owner/operator must submit a copy of the Secondary Containment Testing Report <br />Form and required attachments to the local UPA within 30 days of completion of the test. [23 CCR §2637(f)] <br />F. Record Keeping <br />The UST owner/operator must maintain secondary containment testing records on‐site, or off‐site at a <br />readily accessible location if approved by the local UPA, for at least 36 months. These records must be made <br />available, upon request within 36 hours, to the local UPA or the State Water Resources Control Board. [23 CCR <br />§2712(b)(1)(F)] <br />G. Repairs and Retrofits <br />1. The owner or operator of any UST system that cannot be tested in accordance with these requirements <br />must replace the secondary containment with a system that can be tested. [23 CCR §2637(b)] <br />2. Check with the local UPA regarding plan check and permit requirements before repairing or retrofitting <br />secondary containment. UPAs cannot approve a repair or upgrade unless it can be demonstrated that <br />the UST system is structurally sound and the method of repair or upgrade will prevent unauthorized <br />releases due to structural failure or corrosion during the operating life of the UST system. [23 CCR §2660(k)]  <br />[Note: Piping pressure testing boots are not regulated components.]