Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 329.01 <br /> Complete the followingchecklist: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. , modem) operational? <br /> ® N/A <br /> ® Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) ® Sump/Trench <br /> Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br /> ® N/A installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? if so, at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E, below. <br /> []Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments : FLAPPER VALVE IN DROP TUBES . SUCTION SYSTEM <br /> CLEANED A LITTLE WATER OUT OF 87 SUMP <br /> Monitoring System Certification Page 2 of 4 2/21 /07 <br /> i <br />