My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 10:15:13 AM
Creation date
9/15/2020 4:26:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ 1 . NEW PLAN ❑ 2. CHANGE OF INFORMATION R0L <br /> I. FACILITY INFORMATION <br /> FACILITY ID # (Agency Use Only) <br /> BUSINESS NAME (Same as FACILITY NAME) R02. <br /> BUSINESS SITE ADDRESS R03. CITY R04. <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g. , activate pump shut-off, etc.) and , if necessary, safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material , but not greater than 30 calendar days , or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br /> for their intended use, will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262. 11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately . <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems , or from clean-up activity, has been in contact with any <br /> hazardous material . If the water is contaminated , it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR § 66262. 11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen (i .e. , rainbow colors), it is contaminated . A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water (hazardous or non-hazardous) from sumps , spill containers, etc. will not be disposed to storm water systems . <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I . Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3 . Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility' s Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED : (Complete nly if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO, R20. R30. <br /> RI L R21 , R31 . <br /> R12. R22. R32. <br /> RI3, R23. R33. <br /> R 14, R24, R34. <br /> R15, R25, R35. <br /> IV . RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME , R40• ITLE R50. <br /> ASS 5 <br /> NAME R41 . TiTU R51 . <br /> NAME R42. TITLE RSz. <br /> NAME R43. TITLE R53. <br /> V . MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS : <br /> ❑ Additional system testing or data collection ` nspection by qualified persons ❑ Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan (12/2010) - 1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.