Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> — — t - - - - - --- - - - - - - - - - - - - - -- - --- - - - - - - - -- -- - - --- --- - - - - - - - -- -- - - -- - -- -- - - - - - - - - - - --- - - - - - - - - - - - - - - <br /> S1aPddre:;. 1 City of Stockton — Corp Yard - 1465 S Lincoln St Stookton I <br /> d = :1PLMAR . . . . . . _ _ . . . . . . <br /> F = FILLS F . _ . . . _ <br /> T = TURBLNNE , , . . , <br /> P = PROBE <br /> V = V A"R <br /> X = SUMP SFNSGR <br /> L = LeakDetector g a <br /> B =Briantra< . <br /> B = Brine Sensor \ <br /> I = Smart Sensor P <br /> S = STP <br /> C = Floats & Chaitu <br /> E _ £ Stop p <br /> x <br /> x <br /> ATG . . . _ . . . . <br /> . _ <br /> tPIPI\G } <br /> Drateia_ of pipiva, <br /> . _ . . _ . . _ - exit Of sump and <br /> UDC's. ?:o <br /> - - - _ `. undereround <br /> draxtvtg i <br /> 4QCUU�a. we <br /> cannot speculate <br /> blue pt-ints., <br /> _ori: item rnrkrgr-ararl thrrt are ner tisiNe to rla cer-ti�ing txlaricfmr aw a <br /> p-gfssietnlopfrdcnor%• mrla-esrleh•fca- irrfornnriarnlprnyrc�. Dt-rnring <br /> tvr ro scede <br /> Date map wasi drawn 45. 18 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your hionitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if Installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary cordainntent areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this She Plan was prepared. <br /> LEGEND <br />