My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1465
>
2300 - Underground Storage Tank Program
>
PR0232272
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 10:15:13 AM
Creation date
9/15/2020 4:26:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232272
PE
2361
FACILITY_ID
FA0003925
FACILITY_NAME
COS MUNICIPAL SERVICE CTR
STREET_NUMBER
1465
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16504015
CURRENT_STATUS
01
SITE_LOCATION
1465 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> — — t - - - - - --- - - - - - - - - - - - - - -- - --- - - - - - - - -- -- - - --- --- - - - - - - - -- -- - - -- - -- -- - - - - - - - - - - --- - - - - - - - - - - - - - - <br /> S1aPddre:;. 1 City of Stockton — Corp Yard - 1465 S Lincoln St Stookton I <br /> d = :1PLMAR . . . . . . _ _ . . . . . . <br /> F = FILLS F . _ . . . _ <br /> T = TURBLNNE , , . . , <br /> P = PROBE <br /> V = V A"R <br /> X = SUMP SFNSGR <br /> L = LeakDetector g a <br /> B =Briantra< . <br /> B = Brine Sensor \ <br /> I = Smart Sensor P <br /> S = STP <br /> C = Floats & Chaitu <br /> E _ £ Stop p <br /> x <br /> x <br /> ATG . . . _ . . . . <br /> . _ <br /> tPIPI\G } <br /> Drateia_ of pipiva, <br /> . _ . . _ . . _ - exit Of sump and <br /> UDC's. ?:o <br /> - - - _ `. undereround <br /> draxtvtg i <br /> 4QCUU�a. we <br /> cannot speculate <br /> blue pt-ints., <br /> _ori: item rnrkrgr-ararl thrrt are ner tisiNe to rla cer-ti�ing txlaricfmr aw a <br /> p-gfssietnlopfrdcnor%• mrla-esrleh•fca- irrfornnriarnlprnyrc�. Dt-rnring <br /> tvr ro scede <br /> Date map wasi drawn 45. 18 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your hionitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if Installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary cordainntent areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this She Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.