Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM ( Page 2 of s) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer IdentifV Tank ID from Section III for each Manufacturer <br /> Owens Corning A 0 B ❑ C ❑ D ❑ <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑x Industry Code or Engineering standard (Specify) : PEI / RP1200 - 17/Fiberglass Tank/- 10 " Hg . 2 Hours <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Tank Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802- UT 3/20/2021 <br /> Under round Storage Tank Tester License #90- 1120 12/31 /2019 <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> Note : Tank A of this report is a 20K, designated for Clear Diesel #2 , and identified as DiesekNorth . <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> j Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith FRP AN I B ❑ C ❑ I D ❑ <br /> E A ❑ B ❑ C ❑ p ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> I <br />€ Q Industry Code or Engineering Standard (Specify): <br /> PEI /RP1200- 17/ Fiberglass Pipe/5 Psi 1 hour <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802- UT 3/20/2021 <br /> Under round Storage Tank Tester License #90- 1120 1 12/31 /2019 <br /> i <br /> i <br /> Interstitial Communication Verification Method Used : <br /> Release pressure at end of Piping Run at Filter Pit Sump , where applicable . <br /> i <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> Product Piping A of this report is for Diesel- North . <br />` Note : Product Piping Containment for the Diesel Tanks is manifolded together and plumbed from the Diesel <br /> Turbine/Product Piping Sumps to the West Wall of the Filter Pit Sump . Then The Diesel Product Piping Containment is <br /> plumbed from the East Wall of the Filter Pit Sump to supply the Diesel Fuel Islands Master Dispensers . Test point is at <br /> UDC #5&6 back to Seal off Boot at East Wall of Filter Pit Sump . <br /> ID = Identification <br />