My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1033
>
2300 - Underground Storage Tank Program
>
PR0232352
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 9:50:01 AM
Creation date
9/15/2020 4:39:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232352
PE
2361
FACILITY_ID
FA0003829
FACILITY_NAME
VANCO TRUCK-AUTO PLAZA
STREET_NUMBER
1033
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323041
CURRENT_STATUS
01
SITE_LOCATION
1033 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM ( Page 2 of s) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer IdentifV Tank ID from Section III for each Manufacturer <br /> Owens Corning A 0 B ❑ C ❑ D ❑ <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑x Industry Code or Engineering standard (Specify) : PEI / RP1200 - 17/Fiberglass Tank/- 10 " Hg . 2 Hours <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Tank Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802- UT 3/20/2021 <br /> Under round Storage Tank Tester License #90- 1120 12/31 /2019 <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> Note : Tank A of this report is a 20K, designated for Clear Diesel #2 , and identified as DiesekNorth . <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> j Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Smith FRP AN I B ❑ C ❑ I D ❑ <br /> E A ❑ B ❑ C ❑ p ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> I <br />€ Q Industry Code or Engineering Standard (Specify): <br /> PEI /RP1200- 17/ Fiberglass Pipe/5 Psi 1 hour <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802- UT 3/20/2021 <br /> Under round Storage Tank Tester License #90- 1120 1 12/31 /2019 <br /> i <br /> i <br /> Interstitial Communication Verification Method Used : <br /> Release pressure at end of Piping Run at Filter Pit Sump , where applicable . <br /> i <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> Product Piping A of this report is for Diesel- North . <br />` Note : Product Piping Containment for the Diesel Tanks is manifolded together and plumbed from the Diesel <br /> Turbine/Product Piping Sumps to the West Wall of the Filter Pit Sump . Then The Diesel Product Piping Containment is <br /> plumbed from the East Wall of the Filter Pit Sump to supply the Diesel Fuel Islands Master Dispensers . Test point is at <br /> UDC #5&6 back to Seal off Boot at East Wall of Filter Pit Sump . <br /> ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.