Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection 0 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181421 2/22/ 19 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> TWO GUYS <br /> Business Site Address City ZIP Code <br /> 147 E . LATHROP RD LATHROP 95330 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Edward Stearns (209) 744-0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 14- 1760 Ex. 09/30/2020 8883080-UT 11 /9/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW , PhikTite & EVR Phase 1 1009893708 Ex 11 /29/2020 OPW 104-635 Ex 3- 14-2020 <br /> Emco 3205 Ex . 11 /16/2020 ATG : VR A31048 Ex. 8/9/19 Incon 1009893708 130/220° <br /> III . OVERFILL PREVENTION EQUIPMENT INSPEC IOINFQRMATION ' s <br /> Inspection Method 9 Manufacturer Guidelines (Specify) : REMOVE AND INSPECT <br /> Used : <br /> ❑ Industry Code or Engineering Standard (Specify) : 19 <br /> ❑ Engineered Method (Specify): <br /> ez 1A <br /> . # of Attached Pages <br /> Attach the inspection procedures and all documentation required to determine the results. : '? 4 <br /> TANK ID : (By tank number, stored product, etc.) 87 91 DIESEL <br /> What is the tank inside diameter? (Inches) 96 96 96 <br /> Is the fill piping secondarily contained? ❑ Yes ❑x No ❑ Yes ❑x No ❑ Yes [ E No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained ? ❑ Yes EjNo ❑ Yes N No ❑ Yes N No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) OPW OPW EMCO WH <br /> 61 SO 61 SO A 1100 <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow ❑x Shuts Off Flow 0 Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> ❑ <br /> (Check all that apply.) Restricts Flow El Restricts Flow El Restricts Flow ❑ Restricts Flow <br /> ❑ A/V Alarm ❑ A/V Alarm ❑ AN Alarm ❑ AIV Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes n No ❑ Yes ❑x No ❑ Yes EE No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 86 86 86 1 /4 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 94 94 94 <br /> Is the overfill prevention in proper operating condition g Yes 0 Yes ❑x Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑ No (Specify in V.) ❑ No (Specify in V) ❑ No (Specify in V) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑x Pass ❑ Fail I Z Pass ❑ Fail ❑x Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3, Chapter 16 , Section 2637. 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AN = Audible and Visual <br />