Laserfiche WebLink
STATEMENTS FROM INSPECTION ON JUNE 11 , 2019 <br /> # 209 WILL DISCUSS WITH THE DO TO CONDUCT THE MONTHLY <br /> INSPECTION WITHIN THE REQUIRED TIME FRAME AND THAT <br /> THE REPORTS ARE PROPERLY FILLED OUT AND INCLUDE ALL <br /> REQUIRED INFORMATION IS INCLUDED . <br /> # 320 WE TRIED TO SCHEDULE THE OVERFILL TEST BEFORE THE <br /> REQUIRED DATE BUT THE TESTING COMPANY WAS UNABLE <br /> TO DO THE TEST BECAUSE THEY WERE TOO BUSY , WE WILL <br /> MAKE SURE THAT THE NEXT TEST WILL BE COMPLETED <br /> IN THE REQUIRED TIME FRAME . <br /> r,-vo GUYOS FQUO 2, rbc <br /> 147 E . Lathrop Road <br /> Lathrop , GA 95330 <br /> Ph . (209) 858 - 2666 <br />