My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 10:43:39 AM
Creation date
9/16/2020 10:27:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0540345
PE
2351
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Violation # Violation Response <br /> Failed to submit a written response within 30 <br /> 121 days of receiving an inspection report FedEx Ground to respond <br /> Failure to maintain monitoring, maintenance, <br /> 201 and follow up action records Please find the alarm log attached - Copy of 953 sensor olarms.xls <br /> Current monitoring plan approved by EHD not <br /> 204 Ifound on site FedEx Ground to respond <br /> Please find the alarm log attached - Copy of 953 sensor alarms .xls - which can <br /> be included in the facility inspection file . <br /> Designated Operator did not inspect all required <br /> items and/or the inspection reports not Certification and test date requirements were reviewed with the Designated <br /> 209 completed Operator and corrected . April 2018 to present reflect these corrections . <br /> This log is kept at the facility . The DO will verify the facility team knows how <br /> Designated Operator employee training not to locate the log during the next inspection . The next inspection is scheduled <br /> 211 performed or log not kept to take place by August 24th . <br /> RFS has dispatched work order 388200 to address this issue . Technician ETA is <br /> confirmed as 08/14 . Technician has completed work to correect VPH issues . <br /> VPH monitoring of the interstitial spaces of the Retest has been requested from Tanknology . Tech notes are attached and <br /> 305 UST system not maintained include detailed findings. <br /> RFS has dispatched work order 388200 to address this issue . Technician ETA is <br /> Failed to have secondary containment or confirmed as 08/ 14 . Technician has completed work to address brine issue in <br /> 314 secondary containment not tight biodiesel blending sump . Technician reseated and sealed loose fitting. <br /> RFS has dispatched work order 388200 to address this issue . Technician ETA is <br /> Secondary containment not constructed to confirmed as 08/14 . Technician has completed work to address brine/liquid <br /> 316 prevent water intrusion (after Jul 2003 ) issue in diesel #2 sump . Technician reseated and sealed loose fitting . <br /> RFS has received a quote to replace the spill bucket. Spill bucket is in <br /> containment . Quote has been sent to Karra for approval . On approval , <br /> No spill bucket, failed to contain five gallons or installation will be scheduled . Follow- up testing will be scheduled post- <br /> 319 failed to provide a means to keep it empty completion . <br />
The URL can be used to link to this page
Your browser does not support the video tag.