Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: loves Fuel Center — 15250 N Thornton Road Lodi, CA 95242 <br /> do ilentsriottisibletoIre *PIPLNG } <br /> p-cfessiornlopfriorrori} mxioesdehfcs ir�arrmiorrrlprny es. Drza, ing (.1RR0«rS) <br /> rxauo scde <br /> Drawing of piping <br /> e2:it of susip and <br /> Scale. UDC's. No <br /> underground <br /> draiving is <br /> (] . cannot speculate <br /> blue prints. <br /> 2424 232222 <br /> SO 5C[A191� Isis 17 1 © <br /> AUTO SIDE . - <br /> Trans Sump . . . • . . - % - 1 I <br /> . _ . _ <br /> A <br /> A A <br /> k <br /> T <br /> i <br /> DIE - DIE - Blue <br /> North Middle EF <br /> DEFSouth <br /> I . <br /> 8i 4 IE <br /> RTY TL / TL F F TL A <br /> A = APLNUAR <br /> j F = FILLS N, . <br /> T = TURBPi iE _O O <br /> P = PROBE <br /> %' = VAPOR <br /> X = SUMP SENSOR . . . . . . . . . <br /> L = LD <br /> A I = A fartivit'r x AUTO SIDE <br /> B = Brine Sensor <br /> I = Suurt Sensor <br /> S = STP <br /> C = Floats At Chains Instructions <br /> it <br /> you a react' ave a iagram hat shows a9 required information, you may include it, rather than this page, with your Monitoring System Certfication. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tankliquid levet <br /> probes (if used for te.k detection). In the space provided, note the date this Site Plan was prepared. <br /> 0Ir <br /> LEGEND <br /> ii <br /> I <br />