Laserfiche WebLink
i <br /> being molt time in the"scrape and flush houses"when the feathers float to the top <br /> of the sump pits.They are then manually raked out and will be disced or rototilled <br /> into the ground to prevent any fly breeding. <br /> f <br /> 5. . Any feed spillage resulting from a mechanical breakdown will be promptly <br /> cleaned up. Since the feed is automatically augered directly into the chicken <br /> hoppers,there is only minimal spillage which will be swept up weekly. The-feed <br /> storage silos are sealed against the weather and do not need to be cleaned(the <br /> chickens routinely go through a full silo every three.days). <br /> 6. The person responsible for servicing the bait stations every two weeks and putting <br /> Out sugar bait as needed, is the onsite manager,currently Doreteo Rivera. <br /> 7. The two residences, their septic systems,the onsite solid waste dumpsters, and <br /> Onsite incinerators have been marked and highlighted on the facility plot map. <br /> cr 1 Q <br /> t <br />