Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? E ❑ ❑ <br /> Check all that apply.) Simulated leak rate verified: E 3 GPH ❑0.1 GPH 02 GPH <br /> Was the testing apparatus properly calibrated? E ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ E <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ E <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? E ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? E ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? E ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? E ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? E ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? E ❑ ❑ <br /> For any answer of"N"above,describe in section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring Is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ®Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> S1 87 PRODUCT E Pass ❑Fail E Pass ❑ Fail <br /> S2 91 PRODUCT E Pass ❑Fail E Pass ❑ Fail <br /> S3 VENTS E Pass ❑Fail E Pass ❑ Fail <br /> S4 VAPOR E Pass ❑Fail E Pass ❑ Fail <br /> S5 DIESEL PRODUCT E Pass ❑Fail ®Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑ Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> How was interstitial communication verified? E Simulated leak at far ends of the interstitial space. ❑Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? E Yes ❑ No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above,describe in section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> PPH=raltrv,a nor hn tr V=Va¢ N=Nn NO=Nnf nrJ0--0-a VPH=Van n M41rPQct tMA4V riMCf=it In=Wonfifir. li <br />