Laserfiche WebLink
Spill Bucket Testing Report <br /> 1. FACILITY INFORMATION <br /> Facility Name: ARCO AM PM 11 83333 Date of Testing: 10/23/2019 <br /> Facility Address: 550 W Valpico Rd Tracy,CA 95376 <br /> Facility Contact: Edgar I Phone: (925)548-7910 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services,Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License# 1005444 ICC Certification 9 5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Hydrostatic <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank T1: 87 M West Fill TI: 87 M East Fill T2: 91 Fill T3: Diesel Fill <br /> Number, Slored Product, etc. <br /> Bucket Installation Type: Direct Bucy Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump x Contained in Sum <br /> Bucket Inside Diameter: 11 'A" 11 '''A" 11 'A" 11 <br /> Bucket Depth: 151/4" 15 1/4" 16" 16 ''/4" <br /> Wait time between applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 1:10 p.m. 1:10 P.M. 1:12 p.m. 1:12'p.m. <br /> Initial Reading(R,): 14 5/8" 14" 141/4" 15" <br /> Test End Time(TF): 2:10 p.m. 2:10 p.m. 2:12 p.m. 2:12 p.m. <br /> Final Reading(RF): L458" /4 <br /> 14" 14' ' 15 <br /> Test Duration(TF—Ti): I hr 1 hr I hr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 1/8" 1/8" 1/8" 1/8" <br /> Criteria: <br /> Test Result: x Pass ❑Fail x Pass ❑Fail x Pass 0 Fail x Pass ❑Fail <br /> Comments: <br /> Technician's Signat Date: 10/23/2019 <br />