My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINDBERGH
>
5000
>
2300 - Underground Storage Tank Program
>
PR0232417
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 10:50:36 AM
Creation date
9/17/2020 11:59:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232417
PE
2361
FACILITY_ID
FA0003676
FACILITY_NAME
GRUPE COMMERCIAL COMPANY HANGER #2
STREET_NUMBER
5000
Direction
S
STREET_NAME
LINDBERGH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S LINDBERGH ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 12/ 17/2019 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> PiteP.ddress: SflRIL& LE4DEBERGHSTOCKTON CA 95267 <br /> Universal Sensors LA-02. . <br /> . 1 DISPEM SER <br /> . . & <br /> X L <br /> KEY <br /> A = APIMM AR Sensor <br /> F = FILLS <br /> PRO <br /> OR <br /> P BE <br /> P = PROSE <br /> L = Turbine 1 Leel: Detector <br /> X = SUMP SENSOR <br /> . . . . B = Brine, Sensor <br /> S = Smart Sensor <br /> C = Floats & Chains <br /> - . . . . E = EStop <br /> _ . <br /> JETA � <br /> (ARROWS) I I . . . . . . . . <br /> DZINAue of . - - - . . . . . _ . <br /> pipingerdtofM h . . . . . . . . . . . . . . . . a , , . , . . . . . . , a . . . , , , . . . , , . . . . , , . . . , , <br /> sump and UDC' El <br /> No tttulugotutd Wit• item= underground that are not visible to the cettifi•ing technician are a professional opinion onh• and are <br /> draping is ealely for informational purposes. Dining not to gale. <br /> accurate, we <br /> cannotspeculate <br /> blue print.. <br /> Date map was drawn : 12/17/49 <br /> Instructions <br /> If you already have a diagram That shorts all required -information, you may ina'ude n, rather than this page, ttfth your Monitoring System Certification_ On your site plan, <br /> shmvthe general Layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels: sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic fine leak detectors; and in-tank liquid lei <br /> pcct:es cif used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> MEN <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.