Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification Monitoring System Certification UST Monitoring Site Plan <br /> ---- -- --� -- - - - -- - - ----- -- - - - - - - - - -- - - - --— --- — — — — <br /> - ----- — ---- -- '----' -- - - - - ----- --- - - - - - -- - - -- ---- - - <br /> Sae Address: Tulare Farms 2771 EAST FRENCH CAMP ROAD FRENCH CAMP CALIFORNIA 95336 <br /> . I I A I I I IKEY <br /> . . . . . . . . . . . . . . . . . . . . . . _ - A = AICNIMAR <br /> F = FILLS <br /> A. T = TURBI.NE <br /> . - - _ P = PROBE <br /> tr = VAPOR <br /> - - . Y = SUJB SENSOR <br /> L = Leak Detector <br /> Af = Rfamvay <br /> B = Brine Sensor <br /> _ REG DIE - I = Smart Sensor <br /> S = STP <br /> C = Floats & Chaim <br /> E = £ Stop <br /> . REG. DISPENSER eUjdP. DIE DISPENSER P„)IM!?,,,,,,. <br /> . - . . _ . . . . . . 000 <br /> . . _ . . . . . <br /> *PIPL\G ; <br /> (ARROWS) <br /> DraNvinE of piping - - - _ . . . . <br /> exit of sump aad - - - - _ - - - . <br /> underground . . . . . . . . . _ _ . . . . . . . . . . . . . . . . . <br /> drawing is accurate, - - - - . . . - . . . . - - - - . . . . . . . . . . <br /> speculate blue . . . . . . . . . . . . . . . . - - - - . . . . . . . . . . . . . . - - - <br /> prints. . . . . . <br /> .1rt.- items muleigiourd that are mat v&ibls to the cenj6-ing tschnicimi ars a <br /> prgfsssional opirtimr onkv mid are sole[vfor hiiformmiom dpioposes. Drmcing <br /> not to scale <br /> Date map was drawn: tl1P;16 <br /> U ST Monitoring Site Plan <br /> Instructions <br /> If you already have a diagram that shows all required information , you may include it rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and inAank liquid level <br /> probes (if used for leak detection). In the space proV.ded, note the date_ this Site Plan was prepared. <br /> LEGEND <br />