Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) <br /> Type of Action ❑Installation Inspection ❑x Repair Inspection ❑36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10186687 3/29/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> CA Gasoline _ <br /> Business Site Address City ZIP Code <br /> 2115 W. Yosemite Ave Manteca 95337 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> Nicholas Poblano (916) 373-1166 <br /> Contractor I Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 617238 8360826 6/2/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) <br /> Veeder-Root inao wim <br /> 111. OVERFILL PREVENTION EQUIPMENT INSPECTION INF <br /> Inspection Method ❑Manufacturer Guidelines(Specify): t� <br /> Used: 1y� -0. 4 20119 <br /> ❑x Industry Code or Engineering Standard(Specify): PEI 1200 <br /> TAI.t�� <br /> ❑Engineered Method(Specify): PE1WTTISE <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product,etc.) 2-Diesel <br /> What is the tank inside diameter?(Inches) 119.63 <br /> Is the fill piping secondarily contained? ❑Yes ❑No x❑Yes ❑No 2 Yes ❑No ❑Yes ❑No <br /> Is the vent piping secondarily contained? ❑Yes ❑No 2 Yes ❑No ❑Yes 2 No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturer(s) Veeder Root <br /> What is the overfill prevention equipment response ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? <br /> ❑ <br /> (Check all that apply.) ❑ <br /> Restricts Flow Restricts Flow [j Restricts Flow E]Restricts Flow <br /> ❑AN Alarm ❑x AN Alarm ❑AN Alarm ❑AN Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes ❑No HI Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) 101 <br /> What is the percent capacity of the tank at which the 90 <br /> overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating condition ❑Yes El Yes ❑Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify in V.) [INo(Specify in V.) ElNo(Specify in V.) ElNo(Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑ Pass ❑ Fail ❑x Pass ❑Fail 11 ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked'Fail'must be explained in this section. Any additional comments may also be provided here. <br /> Audible visual alarm was replaced and retested <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature u;_rm/ i>C /`P_ . f <br /> _ _. <br /> If the facilityhas more components than this formvaccommodatees,additional copies of this page maybe attached. <br /> CERS=Califomia Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=Intemational Code Council,AN=Audible and Visual <br />