Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection 0 36 Month Inspection <br /> 1 . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 3/28/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Ca Gasoline <br /> Business Site Address City ZIP Code <br /> 2115 W. Yosemite Ave Manteca 95337 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Curtis Carpenter (916 ) 373- 1166 <br /> Contractor I Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 617238 8167865 11 /28/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> Service Tech ICC . Veeder Root level 2 , 34 . <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : <br /> Used : OPW Install & Maintenance Guidelines <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages <br /> TANK ID : (By tank number, stored product, etc.) 1 -87 2- Diesel 3 -91 <br /> What is the tank inside diameter? (Inches) 119 . 63 119 . 63 119 . 63 <br /> Is the fill piping secondarily contained? 2 Yes ❑ No x❑ Yes ❑ No [] Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? N Yes ❑ No 0 Yes ❑ No 2 Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) veeder Root veeder Root veeder Root <br /> What is the overfill prevention equipment response ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated ? Z Restricts Flow Z Restricts Flow 0 Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) <br /> ❑x A/V Alarm ❑x AN Alarm Q AN Alarm ❑ AIV Alarm <br /> Are flow restrictors installed on vent piping ? R1 Yes ❑ No Z Yes ❑ No Z Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 101 101 101 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 90 90 90 <br /> Is the overfill prevention in proper operating condition ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level ? 0 No (Specify in V.) 9 No (Specify in V.) El No (Specify in V) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results Pass ❑ Fail J1 ❑x Pass ❑ Fail Pass ❑ Fail [:] Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail' must be explained in this section. Any additional comments may also be provided here. <br /> While testing the overfill audible/visual alarm we found the audible portion was not working properly . A service tech will <br /> return on 3-29- 19 to make repair. <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23, <br /> Division 3 , Chapter 16, Section 2637. 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Coundl, AN = Audible and Visual <br />