Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page -I of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ❑x 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10063345 1 /25/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> FAST LANE GAS TEST FORM 1 of 2 <br /> Business Site Address City ZIP Code <br /> 116 ROTH RD LATHROP <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Felix Ramirez ( 209 ) 744 - 0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 08- 1740 Ex . 03/31 /2020 8883072 - UT 11 /9/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- FF- EBW , PhikTite & EVR Phase 1 1009883708 EX 11 -29 -20 OPW 104-634 Ex 3 - J, 020 <br /> Emco 3147 Ex . 11 - 16-20 VR : B34976 ATG : 7/7/20 Incon 1009883708 Ex 11 -30-20 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION " <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : MAR O ZO � 9 <br /> Used : VR PRobes ATG <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : ENVIRONMENTAL J <br /> nEPARTMENT <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages 6 <br /> TANK ID : (By tank number, storedproduct, etc.) 87 91 DIESEL <br /> What is the tank inside diameter? (Inches) 119 . 75 119 . 75 119 . 75 <br /> Is the fill piping secondarily contained ? ❑x Yes ❑ No Z Yes ❑ No Z Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained ? ❑x Yes ❑ No El Yes ❑ No R Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) VEEDER VEEDER VEEDER <br /> ROOT ROOT ROOT <br /> What is the overfill prevention equipment response ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated ? <br /> (Check all that apply.) ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow <br /> x A/V Alarm ❑x A/V Alarm ❑x A/V Alarm ❑ A/V Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes M No ❑ Yes ❑x No [I Yes ❑X No <br /> El Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 100 100 100 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 90 % 90 % 90 % <br /> Is the overfill prevention in proper operating condition ❑x Yes ❑x Yes ❑x Yes E] Yes <br /> to respond when the substance reaches the <br /> appropriate level ? ❑ No (Specify in V.) ❑ No (Specify in V) ❑ No (Specify in V.) ❑ No (Specify in V) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results M Pass E] Fail E Pass ElFail ZPass El Fail El Pass El Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here . <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3 , Chapter 16, Section 2637. 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = Califomia Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AN = Audible and Usual <br />