Laserfiche WebLink
ell <br /> I,Vl�, n <br /> IV le I <br /> "elv IV <br /> OPW 71SO Overfill Materials Important <br /> Prevention halves ` � <br /> In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARE-certified OPW 7150 Storage Tank (UST), properly <br /> Float: Nitrile rubber, closed cell foam i maintained delivery equipment <br /> vapor-tight Overfill Prevention ValveValve: Aluminum 4 j and a proper connection at the <br /> is designed to prevent the overfill of J tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals : VitonO Delivery personnel should <br /> t be managed and trained <br /> aPositive shut-ofof product delivery. Upper & lower Drop Tube: Aluminum <br /> to inspect delivery elbows <br /> The shut-off valve is an integral part of plastic parts : Acetal ( and hoses for damaged and <br /> the drop tube used for gravity filling . ' ` p missing parts. They should <br /> The OPW 71 SO allows easy installation Hardware: Stainless steel f# always make certain there <br /> is a positive connection <br /> (without breaking concrete) and requires stir . . 11 Isbetween the adaptor and <br /> Features <br /> no special manholes. elbow, If delivery equipment <br /> ® Simple, Easy and Quick f is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid special manholes required . IJ <br /> coupled to the adaptor, a <br /> P q serious spill may result when <br /> level rises to about 95 % of tank Economical — costs a fraction the OPW 71 So closes, causing <br /> capacity, the valve mechanism is of expensive, complicated and a hazard and environmental contamination. <br /> released, closing automatically with <br /> difficult-to install valves. <br /> the flow. This reduces the flow rate to Y <br /> approximately 5 gpm through a bypass ® Furnished Complete — supplied 1 NOTE : The OPW 7150 is <br /> , designed for use on tight-fill <br /> valve. The operator may then stop the with new upper and lower drop tubes, .. <br /> p y p gravity drop applications only, <br /> filling process and disconnect and drain mounting hardware and thorough i Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95 % level, the valve will Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets ®' Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . sa� Quick Drain Feature — <br /> liquid rises to about 98 % of tank ® No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow ® Will Accept a Dipstick ® Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point. • OPW Test Lab results <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and a Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements speed of response of the <br /> shut-off capacity in your P P ® Speeds Delivery Operations <br /> governing alertness ors <br /> delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account <br /> other considerations such as extreme overfill prevention . the tank until the hose " kick " that <br /> tank tilt. In all cases, the upper tube Keeps the Top of UST " Dry;' accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 61 /2 to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for 4sl� Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. 4o Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number: H15524PA <br /> Look for this label for <br /> Listings and =y�nla Aft D A <br /> authenticOPWEVR <br /> Approved products. <br /> Certifications Resoivaes Board e+ vwe IOPW 7150 is EVR Approved for E85 <br /> 1oa O P W sl r,ur rfi ct1ft, � A !JiS <br /> .� � � ��3 <br />