Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces orvault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors, and 11) devices monitoring any other secondary containment areas. <br /> US I Monttonng Site Plan <br /> Site Address= FAST LANE GAS 116 ROTH , LATHROP CA 95330 - DIESEL SIDE <br /> O . VENTS *PIPL\G } <br /> B . . _ - - _ (ARROWS)Drawing of pipes <br /> _ - - - OVER FILL ALARM _ Ila exit of sump and <br /> underground <br /> - drawing is <br /> 186 <br /> ggsut" the <br /> . . . . I cannot speculate <br /> DIE2 . . . . .DIE2 . _ I blueprints. <br /> . . Y B <br /> .176 _ . . . . . . . . <br /> . . . . . . . . . . . <br /> Yr'� B R 17A <br /> X B <br /> 166 . <br /> X B X B X B <br /> 1168 <br /> L L <br /> . _ . . _ . . 15A. " <br /> X B <br /> 14B . . <br /> _ . . - - - <br /> KEY <br /> A =AWNULVAR <br /> F = FILLS . . _ I I I I I I I I <br /> 14A <br /> T = TURBINE " . _ . <br /> P = PROBE . . . . . . . . . . . . . . . . - - • - I . . I X B <br /> V =VAPOR _ - . _ . . . . . . - . <br /> X = SUMP SENSOR . . _ - _ . . - 13. . <br /> L = LeakDetector <br /> B = Brine Sensor . _ . . . . . " . . . . . I <br /> I = Smart Sensor . . . . . . . . . . . . . . <br /> S = STP <br /> C = Floata & Chains <br /> E = E Stop TLS - 350 <br /> Any items underground that are not risible to the certifying technician are a <br /> prossional opini <br /> f' on only and are solely for infomtational purposes. Draaaing not to <br /> scale. <br /> Date map rias dravm0j'5719 <br /> Instructions <br /> If you already have a diagram that shows aU required information. you may include it, rather than this page, with your Monitoring System Gerfficatiom On your site plan, <br /> shay the general layout of tanks and piping. Clearly "identify locations of the following equipment, if Installed: monitoring system control panels: sensors monitoring lank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line [eak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the spare provided, note the date this Site Plan was prepared. <br /> it <br /> LEGEND <br />