My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 4:37:47 PM
Creation date
9/18/2020 2:54:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? 0 ❑ E <br /> (Check all that apply.) Simulated leak rate verified : ❑X 3 GPH ❑ 0. 1 GPH ❑ 0 .2 GPH <br /> Was the testing apparatus properly calibrated ? ❑X ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ X❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected? ❑X ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected? ❑ ❑ ❑X <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? ❑ ❑ X❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ XQ <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks ? ❑ ❑ NWere all items on the equipment manufacturer's maintenance checklist completed ? X ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑X ❑ ❑ <br /> For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply. ) ❑X Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S 1 87 PRODUCT ❑X Pass ❑ Fail ❑X Pass ❑ Fail <br /> S2 VENT 87 QX Pass ❑ Fail OX Pass ❑ Fail <br /> S3 87 VAPOR QX Pass ❑ Fail QX Pass ❑ Fail <br /> S4 91 PRODUCT ❑ Pass QX Fail ❑X Pass ❑ Fail <br /> S5 91 VENT ❑X Pass ❑ Fail QX Pass ❑ Fail <br /> S6 DIESEL PRODUCT ❑X Pass ❑ Fail ❑X Pass ❑ Fail <br /> S7 DIESEL VENT OX Pass ❑ Fail ❑X Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified? QX Simulated Leak at Far Ends of the Interstitial Space ❑X Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑X Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑X Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> S 4 HIGH LIQUID NOT WORKING - Repair and retest by others <br /> i <br /> i <br /> i <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = Vacuum/PressureMydrostatic, ID = Identification <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.