My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:47:21 AM
Creation date
9/18/2020 3:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TOOLCT PROCEDURE BELOW, <br /> FOR 71 SO-TOOL, SEE PAGE 8 71 SO-TOOLCT <br /> FOR 71 SO-TOOLC, SEE PAGE 9 <br /> O <br /> STEP 9C : INSERT 71 SO-TOOLCT OVER INLET TUBE <br /> To install the 71 SO-TOOLCT (sold separately) over the <br /> inlet tube, first loosen the thumb screws, so the tool can <br /> pass freely over the inlet tube flange . Align the slot on <br /> the tool with the key on the inlet tube and insert the <br /> tool down . See Figure 9C . Tip to stop dimension must <br /> be 1 -3/ 1611to 1 - 1 /4" <br /> Loosen Figure 11 C <br /> thumb Hand tighten STEP 12C: DRILL HOLES <br /> screws Tool Slot thumb screws With the inlet tube and 71 SO-TOOLCT in place, carefully <br /> drill a 3/ 16" diameter hole in the upper tube using the <br /> hole in the 71 SO-TOOLCT as a guide . The drill stop is <br /> positioned so it will bottom out against the tool after <br /> ( © the bit has drilled through the upper drop tube. If the <br /> �O I stop is positioned wrong either no hole will be drilled , <br /> _ F' or a through hole could potentially be drilled through <br /> the inlet tube. If no hole is drilled return to step 11 C <br /> }� and check the stop dimension . If a hole is drilled <br /> through the inlet tube or into the screw hole the assem - <br /> bly is not salvageable. Drill (2) more holes in the two <br /> Inlet remaining guide holes . <br /> Tube <br /> Key o o/ o <br /> Figure 9C Figure 10C <br /> STEP 10C : TIGHTEN THE 71 SO-TOOLCT - <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube . Torevent vertical movement of the tool during g Drill through uppertube only <br /> drilling , hand tighten the thumb screws against the up- <br /> per drop tube . See Figure 10C . <br /> STEP 11C: PREPARE DRILL AND BIT <br /> Confirm that the stop on the 3 /16" drill bit supplied Figure 12C <br /> with the 71 SO-TOOLCT is in the correct position before <br /> drilling . The stop is factory installed at a distance be- <br /> tween 1 -3/ 16" to 1 - 1 /4" from the tip with the 71 SO- <br /> TOOLCT. If the stop is not at the correct position it must <br /> be fixed before drilling . <br /> CAUTION : If the drill stop is not in the proper loca- <br /> tion failure of a pressure decay leak test may result. <br /> I <br /> 10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.