Laserfiche WebLink
Vapor Recovery Fill Riser <br /> is r <br /> r <br /> maX <br /> OPW <br /> Ball Float <br /> 14" Minimum <br /> Clearance for <br /> Tube Cut Float 4" NPT <br /> per Local <br /> Requirements Nipple <br /> a <br /> 6" <br /> �— Align Float Along Length of Tank Swivel <br /> Figure 24 <br /> Product Jack <br /> Ada ptor Screw <br /> Kit <br /> Orient socket <br /> adaptor be - FOR TESTABLE MODELS ONLY: Check installation <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly . See page 17 for full testing details . Ap- <br /> ply pipe dope to the socket adaptor threads . Pipe dope <br /> should be a non - hardening gasoline resistant pipe <br /> thread seal compound . Install socket adaptor and <br /> O torque to 3 .5 ftdbs (42 indlos) minimum to 5 . 0 ft- lbs (60 <br /> in - lbs) maximum . After installing socket adaptor where <br /> required , pressure test testable overfill valve per CARB <br /> TP201 . 1 D to ensure valve is vapor tight . <br /> O <br /> Figure 24A <br /> 15 <br /> i <br />