My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:47:21 AM
Creation date
9/18/2020 3:47:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 3 ® CUT THE UPPER DROP TUBE tube . Insert the inlet tube into the upper tube until <br /> Carefully saw through the tube squarely, at the it seats against the flange on the upper inlet tube. <br /> mark made in Step 2. Use a hacksaw with, a new <br /> fine-tooth blade. Rotating the upper tube as the <br /> sawing progresses will minimize run out and STEP 6 ❑ DRILL HOLES <br /> ensure a square 90 degree cut. With the inlet tube in place, carefully drill (3) 1 /8" <br /> CAUTION -DO NOT use a pipe or tubing cutter diameter pilot holes through the drop tube and <br /> to cut the upper drop tube, this may damage the ' inlet tube at three locations at 120 degree <br /> tube, causing it to be out of round thereby intervals around the tube, 11- inch below the <br /> prohibiting assembly of the unit. flange. Using the pilot holes, drill (3) 5/16" diam <br /> holes through the tubes. Remove the burrs from <br /> the drilling operation from the inside of the drop <br /> tube assembly with a fine half round file. <br /> IMPORTANT A 5/16" drill bit must be used. Do <br /> not substitute any other size drill bit. <br /> 1 ' <br /> Cut Line <br /> i <br /> Figure 6 <br /> Figure 3 <br /> STEP 4 O FILE THE <br /> DROP TUBE STEP 7 0 INSTALL SELF-CLINCHING STUDS <br /> File the upper tube Install the three (3) self-clinching studs, lock <br /> square, and remove washers, and nuts in holes with the nuts and lock <br /> any burrs or rough washers to the inside of the tube. Tighten clinch <br /> edges. Make sure the studs securely with a W wrench . Use only the <br /> cut is flat and square. self-clinching studs that are supplied with the <br /> unit. Recommended seating torque is 150 inch- <br /> IMPORTANT: lbs. Do not <br /> Carefully file a good over tighten. <br /> chamfer on the inside <br /> of the drop tube to Figure 4 <br /> provide a lead-in for <br /> the o-ring and inlet tube to be installed in Step 5 . <br /> STEP 5 ❑ } <br /> INSTALL <br /> INLET TUBE <br /> Generously <br /> apply common <br /> grease to the <br /> O-Ring. <br /> Install O-Ring Figure 7 <br /> iinstall O-Ring <br /> n the O-Ring <br /> In Groove <br /> groove of inlet <br /> Figure 5 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.