My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> APPENDICES <br /> Appendix A: FRP Tank Manufacturers' Test Checklists/Data Logs............................................................39 <br /> Appendix A-1: Containment Solutions..................................................................................................................................40 <br /> AppendixA-2:Xerxes............................................................................................................................................................41 <br /> Appendix B: Pressure and Vacuum Conversion Tables...............................................................................43 <br /> Table B-1:Pressure Conversions...........................................................................................................................................43 <br /> Table B-2:Vacuum Conversions—Inches Water Column...................................................................................................43 <br /> TableB-3:Vacuum Conversions—In Hg............................................................................................................................44 <br /> Appendix C: Sample Test Data Sheets.....................................................................................................45 <br /> Appendix C-1:Tank Secondary Containment Integrity Testing Dry Test Method...............................................................46 <br /> Appendix C-2:Piping Secondary Containment Integrity Testing...............................................................................:.........47 <br /> Appendix C-3:Spill Bucket Integrity Testing Hydrostatic Test Method Single-and <br /> Double-Walled Vacuum Test Method................................................................................................... .................48 <br /> Appendix C-4: Containment Sump Integrity Testing Hydrostatic Testing Method..............................................................49 <br /> Appendix C-5:UST Overfill Equipment Inspection Automatic Shutoff Device and Ball Float Valve................................50 <br /> Appendix C-6: Overfill Alarm Operation Inspection............................................................................................................51 <br /> Appendix C-7:Automatic Tank Gauge Operation Inspection...............................................................................................52 <br /> Appendix C-8:Liquid Sensor Functionality Testing.............................................................................................................53 <br /> Appendix C-9:Mechanical and Electronic Line Leak Detectors Performance Tests...........................................................54 <br /> Appendix C-10: Shear Valve Operation Inspection...............................................................................................................55 <br /> Appendix C-11: Emergency Stop Switch Operation Inspection...........................................................................................56 <br /> AppendixD: Publication Reference..........................................................................................................57 <br /> pei.org 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.