My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> of the sump, add water to within 1 inch of the 6.6 Accelerated Precision Hydrostatic Test for Spill <br /> top of the sump. Buckets and Containment Sumps. Electronic preci- <br /> 2.Place the measuring stick vertically at the lowest sion test equipment can be utilized to test spill buckets <br /> point in the sump and extending above the water and containment sumps. It incorporates more sensitive <br /> level in the sump to allow for an accurate mea- equipment that permits a test to be conducted in a shorter <br /> surement to be taken. The location of the mea- period of time.The procedures use the same test fluid and <br /> suring stick must remain the same for each water tests the same volume as other methods outlined in this <br /> level measurement. Document the initial water chapter.The manufacturer of the measurement equipment <br /> level measurement as measured from the bottom should specify the precision and duration of the test and <br /> of the sump.Alternative measurement methods the pass/fail criteria. However, pass/fail criteria should <br /> may be used provided that the measurement to not be less stringent than those prescribed for the 1-hour <br /> 1/16 (0.063)inch can be made. test in Section 6.5.7. <br /> 3.Take all precautions to prevent the water level The data sheet for Sections 6.2 or 6.5 may be used for this <br /> from being disturbed during the duration of the test.Refer to Appendix D. <br /> test. 6.7 Proper Handling of Test Liquids. Test liquids <br /> 4.After 1 hour, document the ending water level must be handled properly. Check with the AH7 regarding <br /> measurement. requirements. <br /> 5.Upon completion of the test: _-7 <br /> • remove all water and properly dispose of it II ' <br /> according to Section 6.7; <br /> • reinstall any interstitial monitoring sensors in <br /> their proper positions; <br /> • return the test boots or secondary containment <br /> fittings to their pre-test operating configurations; <br /> • inspect and reinstall all containment sump lids, <br /> gaskets and covers. <br /> Water FIGURE 6-7. The test fluid level in the tank sump must <br /> be at least 4 inches above the highest sump penetra- <br /> Electrical tion or sidewall seam. <br /> Conduit <br /> Product <br /> Piping <br /> ti <br /> rt 4 <br /> FIGURE 6.6. To prevent leakage, check all penetration ` <br /> fittings before adding water to ensure they make a tight <br /> seal. <br /> FIGURE 6-8. Mea- <br /> f suring sticks used <br /> 6.5.7 Pass/Fail Criteria. If the water level to measure the <br /> changes less than 1/8(0.125)inch,the containment / water level should <br /> sump passes the integrity test. be securely mount- <br /> ` ed to ensure that <br /> If the water level changes 1/8(0.125)inch or great- they do not move <br /> er, the containment sump fails the integrity test. +' during the test. <br /> :r <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.