My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
610
>
2300 - Underground Storage Tank Program
>
PR0521866
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 12:41:21 PM
Creation date
9/21/2020 9:32:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521866
PE
2371
FACILITY_ID
FA0014852
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
610
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
04745039
CURRENT_STATUS
01
SITE_LOCATION
610 S Cherokee Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> • properly anchored to the dispenser box frame or 10.3.4 Test Equipment. None, this is a visual <br /> dispenser island; inspection. <br /> • shear section located between 1/z inch above and 10.3.5 Test Procedure. <br /> '/z inch below the level of the top surface of the <br /> dispenser island; 1.Inspect the vapor shear valve for proper <br /> installation and anchoring. The portion of the <br /> • lever arm free to rotate and able to snap the pop- shear valve located below the shear section <br /> pet valve shut/closed; must be rigidly anchored to the dispenser box <br /> • appropriate plug properly installed in the test frame or the concrete dispenser island using <br /> port; hardware and materials specifically designed <br /> for this purpose. The portion above the shear <br /> • no fuel flow from the dispensing nozzle when section must be rigidly mounted to the inside of <br /> the product shear valve is closed. the dispenser. If the shear valve is not properly <br /> If any one of the passing criteria noted above is not <br /> anchored, notify the appropriate person to have <br /> met,then the shear valve fails the test. it repaired. <br /> 10.3 Vapor Shear Valves. 2.Place the cover back on the dispenser and <br /> remove barricades. <br /> 10.3.1 Purpose. The purpose of this test and 10.3.6 Pass/Fall Criteria. If a vapor shear valve <br /> inspection is to verify that the vapor shear valves, meets all of the following criteria,it passes the test: <br /> if present,are properly installed per manufacturer's <br /> specification. • properly anchored to the dispenser box frame or <br /> dispenser island; <br /> 10.3.2 Description of Test. The vapor shear <br /> valve is inspected for proper installation per the shear section located between 1/z inch above and <br /> 1/x <br /> manufacturer. inch below the level of the top surface of the <br /> dispenser island. <br /> 10.3.3 Preparation. Barricade the entire dis- <br /> penser that is to be inspected and tested so that no If any one of the passing criteria noted above is not <br /> customers will attempt to pump fuel. Open the dis- <br /> penser cover to access the inside of the dispenser. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.