Laserfiche WebLink
W.O.# NW1-2338727 Cust Ref# : COCO-0015297489 <br /> UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM(Page i of i) <br /> Type of Action ❑installation Inspection ❑Repair Inspection 36 Month Inspector <br /> I. FACILITY INFORMATION <br /> CERS ID 101Date of Civer)3A PrIntentbn Equipment Inspection <br /> Bussn"s Name(Same as Facility Name or DBA-Doing Business As) <br /> t'irZ � 10 <br /> Business Site Add(�s City ZIP Code <br /> 7LA00 rJ r•/1 (., �)-v, - - c / S 3 <br /> il. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Techn n Perfortining the Inspection(Print as shown on the ICC Centihcation.) Phone q <br /> Contractor/Tank Tester Llodnse P ICC Certification# ICC Certifliclition Expirat n Date <br /> Overfill Prevention Equipment Inspection Training and Certcations(List applicable certifications.) <br /> 00 !� - C, r <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFOAMAtION <br /> Inspection MethodManufacturer Guidelines(Specify) <br /> Used <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. u of Attached Pages <br /> TANK 10:(By tank number,stored product,etc.) f.M i r�gq3 1 k CS f ' <br /> What is the tank inside diameter?(inches) <br /> Is the rill piping secondarily contained? Yes ❑No %Yes ❑No O.Yes ❑No ❑Yes ❑No <br /> Is the vent piping secondarily contained? ❑Yes ®-No ❑Yes W}No ❑Yes D§.No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufadurer(s) 4tr r k0el G <br /> tit/ &PW <br /> What is the overfill prevention equipment response ❑Shuts OH Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts OH Flow <br /> when activated? <br /> (Check all that apply.) ja Restrict Flow aResMets Flow aRestncts Flow ❑Restricts Flow <br /> Alarm PAN Amann Alarm ❑ArV Alarm <br /> Are flow restikyors installed on vent piping? I 9,Y—es ❑No $Lyes ❑No AYes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set / <br /> to activate?(Inches from bottom of tank.) I D 5 i o5 I OS <br /> What Is the percent capacity of the tank at which the a n U � <br /> overfill prevention equipment activates? f i 5 /c' g 5 - <br /> Is the overfill prevention In proper operating conditiony� Yes Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate levell No(Specify in V.) ❑No(Specify in V.) Cj No(Specify in V.) ❑No(Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfifl Prevention Inspection Results ❑Pass Fait ❑Pass Fad 1 ❑Pass OFa,l <br /> [I Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked-Fail- ust be explained In this section. Any additional comments may also be provided here. <br /> lct�75 care- CJ! 6�_f g6CIC, i h r 5�1ck�ld t° 90/ <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was Inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Sectlon 2637.2 and all the information contained herein Is accurate. <br /> UST Service Tect]! Sign e <br /> 1 <br /> If the facility hes more compo ants than thils form accommodates,addldonst copies of this page may be aaachad. <br /> CERS=Caf(anie Enwonnenilal Reporting System.ID=Identilication.LIST=Undekgokrd SiOnVe Tarte,ICC=lrlanational Code Card.NV=Audile and V" <br /> OVERFILL INSPECTION REPORT <br />