My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 12:57:14 PM
Creation date
9/21/2020 10:28:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> }_ M C C a m g b e l l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> "When Quality Counts" http://www.mccampbell.com/E-mail:main@mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: GHD Project: 11191863;212470-Tracy Chevron Work Order: 1905227 <br /> Client Contact: Mohamed Ibrahim QC Level: LEVEL 2 <br /> Contact's Email: Mohamed.Ibrahim@ghd.com Comments: Date Logged: 5/3/2019 <br /> ❑WaterTrax WriteOn EDF Excel EQuIS ❑Email ❑HardCopy ThirdParty ❑J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1905227-013A P9@4' Soil SW8015B(Diesel&Motor Oil) 1 80Z GJ,Unpres ❑ 5/3/2019 13:50 2 days F <br /> SW6020(Lead) ❑ 2 days I <br /> SW802113/801513m(G/MBTEX) U 2 days L <br /> SW8260B(VOCs) ❑ 2 days <br /> 1905227-014A P10@ Soil SW8015B(Diesel&Motor Oil) 1 8OZ GJ,Unpres U 5/3/2019 2 days L <br /> SW6020(Lead) 2 days F <br /> SW8021B/8015Bm(G/MBTEX) 2 days I <br /> SW8260B(VOCs) 2 days F <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 4 of 4 <br /> Page 85 of 88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.