Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) <br /> Type of Action Installation inspection <br /> -. _ ❑Repair Inspection ©36 Month inspection <br /> CER10 1. FACILITY INFORMATION -- <br /> S �- <br /> 10184563 Date of Overfill Prevention Equipment Inspection <br /> Business Name(Same as Facility Name or DBA-Doing Business As) _ - __ 10/5/18 <br /> Chevmn 212470 <br /> Business Site Address <br /> 3400 N MacArthur i1P Code <br /> - _ Trac _ ON <br /> _ i 95376 <br /> _ II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATI <br /> Name of UST Service Technician Performing the Inspection(print as shown on the ICC Cerbacabon) Phone a <br /> Edwin Pineda (209)365. 46 Ern <br /> 74311 ctorrTank Tester License* ICC Certification t 1 ICC Certification Expiration Date --� <br /> 743160 8373052 ; 6/26/19 <br /> Eq <br /> Overfill Prevention Equipment Inspection Training and CerSficationa(List appkcable certiacabons) — -- - <br /> . OPW 100726 1L].6/19 <br /> 111. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORM_ATION <br /> inspection Method Used.- ®Manufacturer Guidelines(Specify)OPW — <br /> ❑Industry Code or Engineering Standard(Spec fy) <br /> ❑Engineered Method(Spec;tyi <br /> Athch the kispecdwprocedures and ad documentation required to determine the results. <br /> III of Attached Pages <br /> Tank ID (By tank number stored product etc) T1 Prem_ __ T2 R T3 DI@SAI <br /> ` What is the tank Inside diameter?(Inches) - - - <br /> Is the fill piping secondarily contained ®11 Yes ❑No 0 Yes ❑No ❑Yes <br /> ❑No El Yes ❑No <br /> Is the vent piping secondarily contained? ❑Yes ®No ❑Yes 0 No ❑Yes <br /> _ _ _ ®No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufachxer(s) OPW OPW OPW <br /> What is the overfill prevention equipment ❑Shuts Ott Flow ❑Shuts Oft Flow ❑Shuts Off Flow ❑Shuts Ott Flow <br /> response when activated? ®Restricts Flow ®Restricts Flow ®Restricts Flow ❑Restricts Flow <br /> (Check all that apply) <br /> ❑AIV Alarm ❑AN Alarm ❑A(V Alarm ❑AIV Alarm <br /> Are How restnctors installed on vent pipings ®Yes ❑No ®Yes ❑No ®Yea ❑No <br /> _ ❑Yes ❑No <br /> At what level in the tank is the overfill prevention <br /> set to activate?(Inches from bottom of tank) 105 105 106 <br /> What is the percent capacity of the tank at which - -- — _ <br /> the overfill prevention equipment acbvates> 95 95 <br /> 95 <br /> Is the overfill prevention in proper operating =Yes <br /> ®Yes ®Yes ❑Yes <br /> condition to respond when the substance teaches the appropriate level? ❑No ❑No ❑No <br /> (Specify in section V li fSPe m eeef:on v <br /> ` Y ) (3p.—fy In acuwoo V) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results _ ®Pass ❑Fail Pass ❑Fail Q Pass Fail ❑ <br /> ❑FaH <br /> V. COMMENTS <br /> 4ll items marked'Fatt-must be enolained to this section Any additional comments may also be provided here <br /> Site has both an external alarm and ball floats <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,title 23,division 3, <br /> chapter 16,section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature - - - --- - -- { <br /> N the faeiNty has more components than this form accommodates, additional copies of-this-page may be attached. <br /> CERS=GaRoniia EnViOnimental RefxwWirl Systuir IC,=kksrtficroon.UST=Unrfcv At"A storage talk.ICC=k4erru0anal Code Council.AN=PAidibie and visual <br />