Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? N ❑ ❑ <br /> Check all that apply.) Simulated leak rate verified : N 3 GPH ❑ 0 . 1 GPH ❑ 0 .2 GPH <br /> Was the testing apparatus properly calibrated? N ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ N <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? N ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? N ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? N ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? N ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? N ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? N ❑ ❑ <br /> For any answer of "N" above, describe in section Xlll how and when these issues were or will be corrected. <br /> XI11 . COMMENTS <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply. ) N Vacuum ❑ Pressure N Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test Test <br /> L1 87A ANNULAR N Pass ❑ Fail ❑ Pass ❑ Fail <br /> L2 87B ANNULAR N Pass ❑ Fail ❑ Pass ❑ Fail <br /> L3 91 ANNULAR N Pass ❑ Fail ❑ Pass ❑ Fail <br /> L4 ADDITIVE ANNULAR N Pass ❑ Fail ❑ Pass ❑ Fail <br /> L5 87A FILL SUMP N Pass ❑ Fail N Pass ❑ Fail <br /> L6 87B FILL SUMP N Pass ❑ Fail N Pass ❑ Fail <br /> L7 91 FILL SUMP N Pass ❑ Fail N Pass ❑ Fail <br /> L8 ADDITIVE FILL/STP SUMP N Pass ❑ Fail N Pass ❑ Fail <br /> L9 ADDITIVE VENT SUMP N Pass ❑ Fail N Pass ❑ Fail <br /> S1 ADDITIVE PRODUCT N Pass ❑ Fail N Pass ❑ Fail <br /> S3 ADDITIVE VENT N Pass ❑ Fail N Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? N Simulated leak at far ends of the interstitial space . ElVisual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? N Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "FAIL " above, describe in section XV how and when these issues were or will be corrected. <br /> XV . COMMENTS <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification <br />