My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALL
>
5433
>
2900 - Site Mitigation Program
>
PR0545810
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 4:54:27 PM
Creation date
9/21/2020 4:48:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545810
PE
2960
FACILITY_ID
FA0025925
FACILITY_NAME
BREA AG SERVICE
STREET_NUMBER
5433
STREET_NAME
WALL
STREET_TYPE
RD
City
LINDEN
Zip
95235
CURRENT_STATUS
02
SITE_LOCATION
5433 WALL RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not recognize hazardous waste site work as being in the <br /> construction industry ; therefore, it is incumbent upon <br /> contractors/responsible parties to ensure that SSP' s for site that <br /> contain- any of these materials are in compliance with applicable <br /> regulations . <br /> III . Resources <br /> The TSCD staff includes industrial hygienists in each Regional <br /> Office who are available to assist in the development of SSP' s . <br /> The primary responsibility for the SSP lies with the contractor/ <br /> responsible party . However, the TSCD industrial hygienists ere <br /> responsible for review and approvel , prior to any site activities, <br /> of the SSP and any other health and safety considerations for a <br /> specific project. Verbal communications between the parties <br /> preparing the SSP and TSCD industrial hygienists is encouraged as <br /> this usually results in more expeditious approval of the SSP, which <br /> will then decrease the waiting period before site activities can <br /> begin. <br /> In terms of written materials, the EPA provides additional guidance <br /> documents regarding site safety and SSP development . <br /> Contractors who are working directly for the TSCD should consult <br /> their contracts or task orders for items which may be required in <br /> an SSP over and above the basic requirements detailed in this <br /> document. <br /> 1OX186 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.