Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> /f you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitorina Site Plan <br /> Site Address_ I K[}MAL EROS: SM HOMAL EROS FRENCH GAUP IWAO MENCH (AMP CALIFORNIA 95131 I <br /> r 1 4 1 1 1 1 . I , J� I . 0 1 <br /> 87 <br /> • • <br /> ilt . . . <br /> _ T _ . . . <br /> I I I <br /> DSL . . <br /> A <br /> XI I . _ . <br /> . . . . . KE3 <br /> A = AR NTLAR <br /> *PII'I13: } <br /> F = FILLS <br /> Drawing of piping _ _ T = TL7 130E <br /> E exit of sump and P = PROBE <br /> UDC's. iso = <br /> undo ground — <br /> P P <br />>; X SUMP SENSOR <br /> drauing is L = IAADetector <br /> accurate, we bI =Stanway <br /> cannot speculate 0 4 1 1 ' 4 1 1 <br /> B = $rine Sensor <br /> blue prints. I = Smart Sensor <br /> . ; S = STP <br /> Sri items rrrz rgnxorl t3r�a nie rrar risible to fir aer7tAingix7aricrrer, n e- n C = Floats & Chaim <br /> riessicrarl opiraara erne' nrr7,a e sc7eh^fea- iiIler wioFxdpenpxa. Da dry E = E Stop <br /> rx�rroscrea <br /> Instructions <br /> LEGEND <br />