Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of 6) <br /> VIII . MONITORING SYSTEM AND PROGRAMMING <br /> Y N NA <br /> Fsectionust be completed if a monitoring panel is used to perform leak detection monitoring. ❑ ❑ ❑ <br /> Are the visual and audible alarms operational? <br /> Were all sensors visually Inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, FX1 ❑ ❑ <br /> functionally tested , and confirmed o erationai? p El El <br /> all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> their proper operation? 14 <br /> Was monitoring system set-up reviewed to ensure proper settings?9 <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? X❑ ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? X❑ ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically FRI ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? 0 ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ❑X Sump ❑X Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e .g . , modem) operational? X❑ ❑ I ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑X Check this box if tank gauging is used only for inventory control. (Do not complete this section.) y N NA <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) <br /> This section must be completed if in-tank gau Ing is used to perform leak detection monitorings <br /> i Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for F1 El ❑ <br /> round faults? <br /> Were all in-tank gauging probesvisually inspected for damage and residue buildup to ensure that floats move freely, functionally ❑ ❑ El <br /> tested , and confirmed operational? <br /> Q El <br /> Was accuracy of system's product level readings tested? ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? El 1:1 1:1 <br /> Were all items on the equipment manufacturer's maintenance checklist completed? F] El El <br /> how and when these deficiencies were or will be corrected. <br /> For any answer of "N" above, describe in Section XI <br /> X10 COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />