My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 2:30:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 I TRAINING <br /> A TECHNICAL TRAINING I <br /> y <br /> S s <br /> CERTIFICATION s CERTIFICATION <br /> THIS CERTIFICATE IS ISSUED IN RECOGNITION THAT THIS CERTIFICATE IS ISSUED IN RECOGNITION THAT <br /> Jessie D, Andrada David Delgado <br /> HAS SATISFACTORILY COMPLETED HAS SATISFACTORILY COMPLETED <br /> Phase 1 UST Enhanced Vapor Recovery Phase 1 UST Enhanced Vapor Recovery <br /> (Installation,Configuration&Troubloshooting) (Installation,Configuration&I roubleshooting) <br /> Dec 31, 2016 100574 Jan 01, 2019 Dec 31, 2016 100562 Jan 01, 2019 <br /> IMF OCn trtO w.ktrO W.-OM"I IBM DITI IFNF—t1 17OIf.Hifx W, <br /> .," UHiVERSITY - O P WUNIVas TY %� o P w ;. <br /> ENVIRONMENTAL <br /> TECHNICAL <br /> TRAININ <br /> 1 TRAINING i <br /> h Y i <br /> ` <br /> CERTIFICATION <br /> CERTIFICATION <br /> y1 <br /> THIS CERTIFICATE IS ISSUED IN RECOGNITION THAT THIS CERTIFICATE IS ISSUED IN RECOGNITION THAT <br /> Juan Delgado Rafael Flores <br /> HAS SATISFACTORILY COMPLETED HAS SATISFACTORILY COMPLETED <br /> Phase 1 UST Enhanced Vapor Recovery Phase 1 UST Enhanced Vapor Recovery <br /> (Installation,Configuration&Troubleshooting) (Installation,Configuration&troubleshooting) <br /> Dec 31,2016 100579 Jan 01,2019 Dec 31, 2016 0154737 Jan 01.2019 <br /> ICtOO OOIE ifCN YONIre 17111OnN OOOI 3101 tall rICN Mp11111 EC/NATION Boil <br /> QtNii-R&ITY u� o PVLI� ' U—miki5—IT Y O Pw <br /> ��yfix- <br />
The URL can be used to link to this page
Your browser does not support the video tag.