My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/22/2020 2:30:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO�TOOLCT PROCEDURE BELOW, <br /> FOR 71 SO-TOOL, SEEPAGES 71 SOTOOLCT <br /> FOR 7'1 SO-TOOLC, SEE PAGE 9 <br /> STEP 9C: INSERT 71SOwT0OLCT OVER INLET TUBE <br /> To install the 71 SO-T00LCT (sold separately) over the <br /> inlet tube, First loosen the thumb screws, so the tool can <br /> pass freely over the inlet tube flange. Align the slot on <br /> the tool with the key on the inlet tube and Insert the -- <br /> tool down . See Figure 9C , Tip to stop dimension must <br /> be 1 .3/ 16" to 1 - 1 /4" <br /> Loosen Figure I I <br /> thumb Tool Slot Hand tighten STEP 12C: DRILL HOLIES <br /> screws thumb strews With the inlet tube and 71 SO-TOOLCT in place, carefully <br /> - drill a 3/16" diameter hole in the uppertube using the <br /> i3- i E� hole In the 71 SO-700LCT as a guide. The drill stop is <br /> yl► . f�lei <br /> 'j r�� V t%�, ^, '" positioned so it will bottom out against the tool after <br /> �f c - � the bit has drilled through the upper drop tube. If the <br /> t . .._I== ' t:= :} stop Is positioned wrong either no hole will be drilled, <br /> or a through hole could potentially be drilled through <br /> - '• the inlet tube. If no hole is drilled return to step 11 C <br /> (V § r' t � j f and check the stop dimension. if a hole Is drilled <br /> through the Inlet tube or Into the screw hole the assem- <br /> l• I bly is not salvageable, Drill (2) more holes in the two <br /> Inlet i I remaining guide holes. <br /> i Tube <br /> Key <br /> o��- <br /> I a <br /> Figure 9C Figure 10C \ <br /> STEP IOC: TIGHTEN THE 71 SO-TOOLCT <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube. To prevent vertical movement of the tool during Drill through upper tube only <br /> drilling, hand tighten the thumb screws agalnstthe up- <br /> per drop tube. See Figure 1 QC . <br /> STEP 11C: PREPARE DRILL AND SIT <br /> Confirm that the stop on the 3/16" drill bit supplied Figure 12C <br /> with the 71 SO-TOOLCT is in the correct position before <br /> drilling. The stop is factory installed at a distance be- <br /> tween 1 -3/16" to 1 -1 /4" from the tip with the 71 SO- <br /> TOOLCT. If the stop is not at the correct position it must <br /> be fixed before drilli ng . <br /> CAUTION: if the drill stop Is not In the proper lora <br /> tion failure of a pressure decay leak test may result. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.