My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3040
>
2300 - Underground Storage Tank Program
>
PR0506497
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2020 4:03:21 PM
Creation date
9/22/2020 2:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506497
PE
2351
FACILITY_ID
FA0007461
FACILITY_NAME
7-ELEVEN INC #14113
STREET_NUMBER
3040
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10027018
CURRENT_STATUS
01
SITE_LOCATION
3040 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2 <br /> VII . INSPECTION HISTORY Y N <br /> Has each follow-up action of section III from the previous inspection been completed appropriately? X <br /> Attach documentation verifying appropriate service to this report.) <br /> VIII . ALARM HISTORY <br /> Attach a copy of the alarm histoU reporUlonto this report. <br /> Is the monitoring system powered on and in proper operating mode? X <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? <br /> (Attach documentation verifvina aoorooriate service to this recort.) X <br /> Have all containment sumps, that have had a leak detection alarm since the previous inspection, been responded to by a X <br /> qualified UST service technician? <br /> List below in section IX, all containment sumps that have had a leak detection alarm since the previous inspection and have not been responded to <br /> by a qualified UST service technician . Containment sumps listed below require a visual inspection for damage , water, debris, hazardous substance, <br /> and proper sensor location . The results of the visual inspection must be recorded in section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage, water, debris, and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> N/A X N/A X <br /> N/A X N/A X <br /> N/A X <br /> N/A X <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? IVIA X M �` <br /> Is the spill container free of damage, water, debris and hazardous substance? <br /> TANK ID Tank-87 X <br /> Tank-91 X <br /> Is the fill pipe free of obstructions? <br /> Tank-87 X <br /> TANK ID Tank-91 X <br /> Is the fill cap securely on the fill pipe? <br /> Tank-87 X <br /> TANK ID Tank-91 X <br /> Is the under4soenser containment free of damage , water. debris, and hazardous substance? <br /> Under-dispenser Containment ID Y N N/A Under-dispenser Containment ID Y N N/A <br /> Dispenser-112 X <br /> Dispenser-3/4 X <br /> Dispenser-5/6 X <br /> Dispenser-7l8 X <br /> Ll <br /> Are all sensors in underAispenser containment located to detect a leak at the earliest opportunity? X <br /> X. TESTING AND MAINTENANCE Y N N/A EDATE <br /> R O MS D <br /> Has the monitoring system certification been completed within the past 12 months? X 9/20/18 <br /> Has the spill container testing been completed within the past 12 months? X 9/20/18 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? X N/A <br /> Has the secondary containment testing been completed within the past 36 months? X N/A <br /> Has the tank tightness testing been completed within required timeframes? x N/A <br /> Has the line tightness testing been completed within the required timeframes? X N/A <br /> Other required testing / maintenance was completed within required timeframe. (List test/maintenance items below.) <br /> Test / Maintenance: X N/A <br /> Test / Maintenance: x NIA <br /> Test / Maintenance: X N/A <br /> Test / Maintenance: X N/A <br /> Test / Maintenance: X NIA <br /> XI . FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? X <br />
The URL can be used to link to this page
Your browser does not support the video tag.