My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:05:30 AM
Creation date
9/22/2020 3:15:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM <br />XII. LINE LEAK DETECTOR TESTING <br />GPH =Gallons Per Hour, Y = Yes, N = No, NA= NotApplicable, VPH = VacuumlPressureMydrostatic, ID Identification <br />(Page 5 of <br />6) <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N <br />NA <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0.1 GPH <br />Was the testing apparatus properly calibrated? <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />detected? <br />❑ 0.2 GPH <br />M <br />X <br />❑ <br />❑X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />X❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑ <br />❑ <br />❑ <br />0 <br />X❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ <br />X❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ <br />Q <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />0 <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />❑ <br />❑ <br />For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING <br />EQUIPMENT TESTING <br />❑X Check this box if VPH monitoring is NOT used. (Do not complete this section) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID <br />Component(S) Monitored By This Sensor <br />Sensor Functionality <br />Test <br />Interstitial Communication <br />Test <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ Fail <br />❑ <br />Pass <br />❑ <br />Fail <br />❑ <br />Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space <br />❑ Other (Describe the method in section XV below) <br />❑ Visual <br />❑ Gauge <br />Inspection <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? <br />❑ <br />Yes <br />❑ <br />No (Describe <br />the reason in <br />section XV <br />below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will <br />be corrected. <br />XV. COMMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.