Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL :INSPECTION REPORT ( Page 2 of 2) <br /> VII. INSPECTION HISTORY <br /> Has each follow-up action of Section III from the previous inspection been completed appropriately? Y N <br /> Attach documentation verifying appropriate service to this report, ❑x ❑ <br /> VIII . ALARM HISTORY <br /> Attach a copy of the alarm history report/log to this report. Y N NA <br /> Is the monitoring system powered on and in proper operating mode? p ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? 171 171Attach documentation verifying appropriate service to this report, nx <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a 11 11 0 <br /> qualified UST Service Technician? <br /> List below In Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician. Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance, and proper sensor location. The results of the visual inspection must be recorded In Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage , water, debris , and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage , water, debris, and hazardous substance? <br /> Tank ID 187 2 ❑ Tank ID 1 DIESEL O ❑ <br /> Tank ID 191 (] ❑ TanklD ❑ ❑ <br /> Is the fill ipe free of obstructions? <br /> Tank ID 187 El ❑ Tank ID DIESEL 191 ❑ <br /> Tank ID 191 101 ❑ <br /> Is the fill cap securely on the fillpipe? <br /> Tank ID 187 ED ❑ Tank ID DIESEL 19 ❑ <br /> TanklD 191 Q ❑ Tank ID ❑ ❑ <br /> Is the under-dispenser containment free of damage, water, debris, and hazardous substance? <br /> Under-Dispenser Containment ID Y I N i ' NA Under-Dispenser Containment ID Y N NA <br /> Dispenser 1 /2 0 ❑ ❑ Dispenser 3/4 p ❑ ❑ <br /> Dispenser 5/6 El ❑ ❑ Dispenser 7/8 Mx ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ 01 ❑ ❑ ❑ <br /> ❑ 0I ❑ I ❑ ❑ 0 <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ❑x ❑ ❑ <br /> X. TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months? O ❑ 6/26/2019 <br /> Has the spill container testing been completed within the past 12 months? O ❑ 6/26/2019 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? 2 ❑ ❑ 2/6/2019 <br /> Has the secondary containment testing been completed within the past 36 months? 12 ❑ ❑ 12/27/2017 <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ p <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ Q <br /> Other required testing / maintenance was completed within required timeframe . (List test/maintenance items below.) <br /> Test / Maintenance: Ell ❑ <br /> Test / Maintenance: ❑ ❑ <br /> Test / Maintenance : ❑ Cl <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance: ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> XI . FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? Cx] ❑ <br /> I the facility has more components than this fonn accommodates, additional copies of this page may be attached. <br /> Y = Yes, N = No, NA = NotApplicable, ID = Identification <br />