UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 4 of 6 <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ® [1 El <br /> tested and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ® El Elproper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down 0 the piping secondary containment monitoring system fails to operate or is electrically ® 11 ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ®Sump ®Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? 1 ❑ ❑ <br /> For any answer of"N"above describe in section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed/f in-tank gauging is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination,including testing for ground ❑ ❑ [I <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functionally tested, ElE] ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of"N"above describe in section X/how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> V=Vac N=Nn NA=Nnt Anr4ktaNa <br />