Laserfiche WebLink
contacted to evaluate the find in conformance <br /> with 15064.5 of CEQA. <br /> Steps to Compliance: <br /> A. This measure will be included as a condition of approval in the CUP. <br /> The project applicant shall include these requirements in project plans <br /> and specifications, and environmental awareness training used by <br /> operations staff and contractors. <br /> Justification: The Project has the potential to impact cultural resources during Project operations. Changes in or alterations have been incorporated <br /> into the Project that substantially lessen the potentially significant effects as identified in the Final EIR, so that environmental effects after such <br /> mitigation are reduced to a less than significant Ievel. <br /> pA �4 <br /> :Raza d d Hazardous l�Ia#erEa[s:. <br /> 912 MM 4.5-I. All hazardous materials such as diesel fuel, During Project operations Environmental Health <br /> 4.5-1 oils, Iubricants, and hydraulic fluids shall be stored permitted by planning Services Department <br /> properly and Material Safety Data Sheets shall be on approvals. <br /> site. Hazardous waste shall be managed properly. <br /> Training shall be provided to all personnel involved in <br /> handling of hazardous materials/waste. <br /> Steps to Compliance: <br /> A. Inspections and monito ing would be conducted by the EHSD, <br /> #13 MM. 4.5-2. All wastes (dewatered Class A and B Prior to commencement of Environmental Health <br /> 4,5.2 biosolids, spent sandblast media, cogeneration ash (fly operations permitted by Services Department <br /> ash), treated auto shredder waste and Iime filter cake) planning approvals, and Regional Water Quality <br /> shall be evaluated prior to receipt to ensure that only during subsequent operations. Control Board(RWQCB) <br /> non-hazardous waste is accepted at the proposed <br /> facility. In the case of any hazardous waste detection, <br /> during either normal testing procedures or special <br /> checking of loads, the following procedures will be <br /> strictly adhered to in order to minimize contamination: <br /> a) Immediately after discovery of the contaminated <br /> material,all key personnel will be properly dressed and <br /> 13 <br /> Final Board of Supervisors 3115116 <br />